Official Department for Transport (DfT) Quarterly Release • Updated July 2026

EV Charging in Horsham

Official Department for Transport (DfT) infrastructure audit, hardware density metrics, and capital deployment trajectory for Horsham.

Area overview

Quarterly DfT Audit (July 2026)
EV Infrastructure Rank: A

There are 296 registered physical charging units (devices) in this area.

Above-average infrastructure framework, exceeding the UK national baseline.

Data sourced from official Department for Transport (DfT) central public charging registries. Figures reflect physical hardware enclosures recorded for Horsham.

Note on Devices vs. Plugs / Bays (July 2026 Audit): Official Department for Transport data tracks physical charging devices rather than individual sockets. Because most destination units feature dual sockets and rapid chargers carry multiple connectors, the number of simultaneous parking bays available to charge is typically 1.5x to 2.5x higher than the device count shown above. Residential on-street lampposts and restricted customer-only chargers may be logged separately.
National Benchmark Comparison Baseline: 172 chargers / 100k UK avg

Above UK Average Provision (+14% Capacity)

Above UK Average (+14%)
Current: 296 units (114% of UK baseline) UK Average Target: 260 units

Based on its population of ~151,484 residents, Horsham would require 260 public chargers to meet the UK average. Operating 296 active devices, Horsham stands +14% ahead of the national benchmark. With a balanced mix across slow and rapid speeds (17.2% DC fast share), capital allocation transitions from basic coverage buildout to local substation grid reinforcement, fleet electrification hubs, and multi-bay reliability upgrades.

Capital Deployment & Infrastructure Intelligence
Priority 2: Urban & Curbside Maturation
Balanced Curbside & Destination Asset Profile

The network demonstrates an active balance: 17.2% rapid charging backed by 245 destination AC units. Commercial headroom centers on long-dwell parking concessions, residential on-street public works, and mixed-use urban regeneration schemes where overnight charging unlocks dense residential occupancy.

24-Month Rollout Trajectory

Official DfT deployment trajectory: July 2024 to July 2026

Steady Expansion
July 2024
87
Baseline
July 2025
197
+110 (+126%)
July 2026 (Now)
296
+99 (+50%)
Driver Takeaway & Outlook

Consistent year-on-year network additions with +240% growth across 24 months (+209 devices). The rollout trajectory matches steady public charging demand across the borough.

🏡 Residential Electrification Domestic Dwell

Home Charging & Smart Tariffs in Horsham

Charging overnight on a dedicated EV smart tariff typically costs between 7p to 9p per kWh, unlocking up to 70% operational savings against public on-street or rapid hub pricing.

🏢 Commercial Fleet & Workplace B2B / WCS Grant

Workplace Infrastructure & Fleet Depots

UK businesses, landlords, and fleet operators can claim up to 75% off installation costs (up to £350 per socket) via the government Workplace Charging Scheme (WCS) across up to 40 chargepoints.

* Partner referral links. We may earn an affiliate commission from qualifying consumer installations, tariff switches, or commercial infrastructure consultations at no additional cost to you.

Infrastructure Breakdown for Horsham

Official breakdown of charging speed capabilities and population density benchmarks from central government registries.

En-Route & Rapid 50kW - 350kW+

Rapid & Ultra-Rapid Units

51

High-power DC units engineered for rapid turnaround travel. Delivers 20% to 80% charge in approximately 20–45 minutes.

Destination & Curbside 3kW – 22kW AC

Destination & Standard AC Units

245

Sub-50kW AC units including fast destination posts (7–22kW) at car parks and supermarkets, alongside residential on-street bollards and lampposts (≤6kW).

Per Capita Provision Per 100k

195.4 / 100k residents

In line with the UK national baseline (~172 per 100k), with steady capacity across commercial and parking areas.

Network Speed Composition

Proportional split of public charging hardware by central DfT power delivery category

Standard AC (<50kW): 83% Rapid & Ultra-Rapid (≥50kW): 17%
Curbside Lampposts & Destination Posts (<50kW) Transit Hubs & En-Route DC (≥50kW)

* Local authority quarterly DfT data aggregates destination (7–22kW) and residential curbside (3–6kW) into sub-50kW AC hardware provision.

Compare Similar Infrastructure Benchmarks

UK local authorities operating at comparable per-capita charging density:

View full national rankings →
Local Authority Planning & Capital Brief

Key demographic and infrastructure metrics (~151,484 residents).

Compare vs UK
Population
~151,484
Estate Scale
296 units
DC Fast Share
17.2% (51)
vs UK Average
+23.5

⚡ UK Charging Speeds

Standard / Destination (3kW - 7kW AC)

Typically found at supermarkets, workplaces, and on-street lamp posts. Perfect for top-ups or overnight parking, adding roughly 20-30 miles of range per hour.

Fast / Rapid (22kW - 50kW AC/DC)

Commonly located at leisure centers and retail parks. Can charge a standard EV battery from 20% to 80% in approximately 45-60 minutes.

Ultra-Rapid En-Route (100kW - 350kW+ DC)

Situated at major motorway service stations and dedicated charging hubs. These elite units deliver up to 200 miles of range in just 15-20 minutes for compatible vehicles.

💷 Tariffs & Access Rules

Public EV charging costs across the UK vary extensively based on network operators, speed ratings, and membership tiers:

  • Slow/On-Street charging typically tracks between 40p - 55p per kWh.
  • Rapid commercial hubs generally average between 65p - 79p per kWh.
  • Ultra-Rapid motorway units can climb to 85p+ per kWh due to extreme peak power draw demands.

💳 UK Law: Ad-Hoc Access Mandatory

Under UK legislation, all newly deployed public rapid chargers over 8kW must offer contactless payment without requiring an app or subscription.

🚗 EV Etiquette & Overstay Tariffs

To keep the charging network moving efficiently and avoid frustrating other drivers, follow these critical rules:

  • The 80% Rapid Rule: Move your vehicle once it hits 80% charge. Charging speeds drop drastically past this point to protect battery life, making it inefficient to block others.
  • Avoid ICEing Bays: Park in active charging bays only when your vehicle is actively drawing power.

⚠️ Beware of Overstay Fees

Many major UK networks (such as bp pulse, Gridserve, and Tesla) enforce an automatic rolling overstay fee (often £1.00 per minute) if your vehicle remains plugged in after charging completes.

24/7

Many sites open around the clock

UK-wide

Consistent data across regions

Updated

Regularly refreshed statistics