Rapid & Ultra-Rapid Units
33
High-power DC units engineered for rapid turnaround travel. Delivers 20% to 80% charge in approximately 20–45 minutes.
Official Department for Transport (DfT) infrastructure audit, hardware density metrics, and capital deployment trajectory for Causeway Coast and Glens.
Area overview
Quarterly DfT Audit (July 2026)There are 93 registered physical charging units (devices) in this area.
Baseline development tier. Public charging trails national density benchmarks.
Data sourced from official Department for Transport (DfT) central public charging registries. Figures reflect physical hardware enclosures recorded for Causeway Coast and Glens.
Based on its population of ~141,985 residents, Causeway Coast and Glens requires 244 public chargers to meet the UK national average (172 per 100k). With 93 units currently active, the borough has a shortfall of 151 chargers. Closing this deficit represents an estimated £1.3M – £2.1M capital investment pipeline (hardware, civil works, and DNO grid connections). While arterial rapid units represent 35.5% of existing hardware, overall local volume remains behind. Primary capital priority focuses on expanding low-cost curbside residential posts and neighborhood charging.
A substantial 35.5% of Causeway Coast and Glens's network is dedicated to DC rapid hardware (33 fast units out of 93 total devices). While en-route and commercial transit charging is well-represented, overall borough density remains low (65.5/100k vs ~172 UK avg). Primary capital headroom centers on curbside residential expansion, lamppost charging concessions, and overnight neighborhood parking.
Official DfT deployment trajectory: July 2024 to July 2026
Council network deployment has accelerated. With 32 new chargers installed over the past 12 months (compared to (+4) the previous year), capacity is expanding faster than the 24-month baseline. If current momentum holds, the network is on pace to cross ~125 chargers by mid-2027.
Charging overnight on a dedicated EV smart tariff typically costs between 7p to 9p per kWh, unlocking up to 70% operational savings against public on-street or rapid hub pricing.
UK businesses, landlords, and fleet operators can claim up to 75% off installation costs (up to £350 per socket) via the government Workplace Charging Scheme (WCS) across up to 40 chargepoints.
* Partner referral links. We may earn an affiliate commission from qualifying consumer installations, tariff switches, or commercial infrastructure consultations at no additional cost to you.
Official breakdown of charging speed capabilities and population density benchmarks from central government registries.
33
High-power DC units engineered for rapid turnaround travel. Delivers 20% to 80% charge in approximately 20–45 minutes.
60
Sub-50kW AC units including fast destination posts (7–22kW) at car parks and supermarkets, alongside residential on-street bollards and lampposts (≤6kW).
Currently tracks below the national baseline (~172 per 100k), indicating high headroom for capital investment.
Proportional split of public charging hardware by central DfT power delivery category
* Local authority quarterly DfT data aggregates destination (7–22kW) and residential curbside (3–6kW) into sub-50kW AC hardware provision.
UK local authorities operating at comparable per-capita charging density:
Key demographic and infrastructure metrics (~141,985 residents).
Standard / Destination (3kW - 7kW AC)
Typically found at supermarkets, workplaces, and on-street lamp posts. Perfect for top-ups or overnight parking, adding roughly 20-30 miles of range per hour.
Fast / Rapid (22kW - 50kW AC/DC)
Commonly located at leisure centers and retail parks. Can charge a standard EV battery from 20% to 80% in approximately 45-60 minutes.
Ultra-Rapid En-Route (100kW - 350kW+ DC)
Situated at major motorway service stations and dedicated charging hubs. These elite units deliver up to 200 miles of range in just 15-20 minutes for compatible vehicles.
Public EV charging costs across the UK vary extensively based on network operators, speed ratings, and membership tiers:
💳 UK Law: Ad-Hoc Access Mandatory
Under UK legislation, all newly deployed public rapid chargers over 8kW must offer contactless payment without requiring an app or subscription.
To keep the charging network moving efficiently and avoid frustrating other drivers, follow these critical rules:
⚠️ Beware of Overstay Fees
Many major UK networks (such as bp pulse, Gridserve, and Tesla) enforce an automatic rolling overstay fee (often £1.00 per minute) if your vehicle remains plugged in after charging completes.
24/7
Many sites open around the clock
UK-wide
Consistent data across regions
Updated
Regularly refreshed statistics